Solicitation · SAM.gov
Groundwater Monitoring in Wabasha County, MN
Dept of Defense · Dept of the Army
Key facts
- Response deadline
- Urgent: Due in 1 dayEastern Time. Late responses are usually not accepted.
- Set-aside
- Small business set-asideSmall Business Set Aside - Total Learn more about small-business set-asides
- NAICS
- 541380 · Testing Laboratories and ServicesThe industry code sets the size standard you must meet to compete as a small business. Learn more about NAICS size standards
- Product / service code (PSC)
- F103 · ENVIRONMENTAL SYSTEMS PROTECTION- WATER QUALITY SUPPORTName from the Acquisition.gov PSC Manual (opens in a new tab) (April 2025 edition), checked Nov 12, 2026.
- Place of performance
- Not listed
- Notice type
- Solicitation
- Posted
- Archive date
- SAM.gov removes the notice from active search after this date.
- Solicitation number
- W912ES27QA013
- SAM.gov notice ID
- bc06403d6b8e4526ad14e7c41590c5f8
- Buying organization
- Dept of Defense
- Dept of the Army
- W07V Endist ST Paul
Source: SAM.gov Contract OpportunitiesSynced First seen Nov 16, 2026Official notice (opens SAM.gov in a new tab)
See how this RFP fits your company
Claim your free UEI profile and TeamingIndex checks every notice against your SAM.gov NAICS codes, size, set-aside status and past performance, explains the fit, and emails you new matches.
The U.S. Army Corps of Engineers - St. Paul District is seeking a contractor to perform groundwater monitoring services in support of the Grand Encampment Dredge Material Placement Site Unload project along the Zumbro River near Kellogg, MN in Wabasha County. This solicitation is 100% set-aside for small business under NAICS 541380 with a size standard of $19 million. The contractor will collect water samples from three monitoring wells and up to four government-selected residential wells before, during and after the active unloading of the site in Spring 2027. During the active unload phase samples will also be collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. Water samples will be analyzed by an environmental analytical testing laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters. Pre-Placement (Phase 1) samples will be collected and tested approximately 90, 60 and 30 days prior to the start of the active hydraulic transfer of stockpiled dredge materials to the upland placement site. Samples will be collected and tested during Active Placement (Phase 2) approximately 3, 17, and 31 days after the transfer begins, with options for additional sample collection and testing at approximately 45, 59 and 73 days after start of transfer. Post-Placement (Phase 3) samples will be collected and tested approximately 30, 60 and 90 days after the completion of the materials transfer. The contractor will prepare a final sampling and analysis report, submitted within 50 days of testing completion. All questions should be submitted in writing via the PIEE module Q and A section. Offers should be submitted via the PIEE Module. Click the first link in the Attachments/Links section. --- AMENDMENT 0001 has been added - Amendment 0001 allows Absence/Presence Reporting in place of quantitative MPN Results for both E. coli and total coliform for organic samples.
Plain text from SAM.gov (formatting removed; at most 20,000 characters). The official notice and its attachments govern.
